1. |
MS 1489-2:2023 |
Fire extinguishing installations and equipment - Part 2: Wet and dry firefighting mains (First revision) |
2023 |
2. |
MS 1489-1:2023 |
Fire extinguishing installations and equipment-Part 1: Hose reels and foam inlets (Second revision) |
2023 |
3. |
MS 2780:2023 |
Application of fire safety engineering principles to the design of buildings – Code of practice |
2023 |
4. |
MS 1601-7:2022 |
Specification for the fire resistant doorsets - Part 7: Requirement and methods of determining the performance of panic exit device |
2022 |
5. |
MS 1488:2021 |
Firefighting hoses - Semi-rigid hoses for fixed systems (Second revision) |
2021 |
6. |
MS 1447-3:2021 |
Fixed firefighting systems - Hose systems Part 3: Maintenance of hose reels with semi-rigid hose and hose systems with lay-flat hose (Second revision) |
2021 |
7. |
MS 1447-2:2021 |
Fixed firefighting systems - Hose systems Part 2: Hose reels with lay-flat hose (First revision) |
2021 |
8. |
MS 1447-1:2021 |
Fixed firefighting systems - Hose systems Part 1: Hose reels with semi-rigid hose (Second revision) |
2021 |
9. |
MS 1539-1:2018 (CONFIRMED: 2022) |
SPECIFICATION FOR PORTABLE FIRE EXTINGUISHERS - PART 1: CONSTRUCTION AND TESTING METHODOLOGY (FIRST REVISION) |
2018 |
10. |
MS 2687:2018 |
THE INSTALLATION AND MAINTENANCE OF EMERGENCY AND KELUAR SIGN LIGHTING AND POWER SUPPLY SYSTEMS IN BUILDINGS - CODE OF PRACTICE |
2018 |
11. |
MS 1182:2017 |
CLASSIFICATION OF FIRES (FIRST REVISION) |
2017 |
12. |
MS ISO 6182-9:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEM - PART 9: REQUIREMENTS AND TEST METHODS FOR WATER MIST NOZZLES (ISO 6182-9:2005, IDT) |
2009 |
13. |
MS ISO 6182-8:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 8: REQUIREMENTS AND TEST METHODS FOR PRE-ACTION DRY ALARM VALVES (ISO 6182-8:2006, IDT) |
2009 |
14. |
MS ISO 6182-7:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 7: REQUIREMENTS AND TEST METHODS FOR EARLY SUPPRESSION FAST RESPONSE (ESFR) SPRINKLERS (ISO 6182-7:2004, IDT) |
2009 |
15. |
MS ISO 6182-7:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 7: REQUIREMENTS AND TEST METHODS FOR EARLY SUPPRESSION FAST RESPONSE (ESFR) SPRINKLERS (ISO 6182-7:2004, IDT) |
2009 |
16. |
MS ISO 6182-6:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 6: REQUIREMENTS AND TEST METHODS FOR CHECK VALVES (ISO 6182-6:2006, IDT) |
2009 |
17. |
MS ISO 6182-5:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 5: REQUIREMENTS AND TEST METHODS FOR DELUGE VALVES (FIRST REVISION) (ISO 6182-5:2006, IDT) |
2009 |
18. |
|
|
|
19. |
MS ISO 6182-4:2000 (CONFIRMED:2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 4 : REQUIREMENTS AND TEST METHODS FOR QUICK - OPENING DEVICES |
2000 |
20. |
MS ISO 6182-3:2009 (CONFIRMED: 2022) |
FIRE PROTECTION - AUTOMATIC SPRINKLER SYSTEMS - PART 3: REQUIREMENTS AND TEST METHODS FOR DRY PIPE VALVES (FIRST REVISION) (ISO 6182-3:2005, IDT) |
2009 |